Home About us Workshop Site services Heavy machinery Blog Contact us Request a quote
ABC boilermaker welding the undercarriage of a walking dragline raised on blue jacking stands during an on-site shutdown
Blog · Mackay · Paget · Bowen Basin

The numbers do the bragging. These are the stories.

Projects Workshop Heavy machinery Careers Community
Featured — project story

Marion 8750: the propel gear case changed out in situ, on the pit floor of the Bowen Basin.

Recent posts

From the floor and the field.

Every story below is built on documented work — capability statements, SEEK data and project photography. No marketing fiction.

Two ABC fitters in hi-vis working on a large red-painted machinery casing assembly inside the workshop
Projects

Principal contractor: a six-week ROM shutdown at BMA Peak Downs

Planning, crews and plant for one of the Bowen Basin’s bigger maintenance windows — delivered as principal contractor.

6-week ROM shutdown · principal contractor
Peabody P&H electric face shovel flanked by two cranes during on-site assembly, a rainbow arcing over the mine site
Projects

Five years at Coppabella — LTI-free

Monthly maintenance down-days, breakdowns and mini shutdowns, every month for five years, without a lost-time injury.

5 years monthly maintenance · LTI-free
Crane hoisting a large structural dragline component overhead at the Curragh mine, viewed from below against blue sky
Projects

Dragline tub work at Curragh

On-site welding and structural repair at the tub of a walking dragline.

[Directors] scope & dates to confirm
A CNC machine cutting a large curved steel arc segment clamped to the bed, swarf and sparks at the tool
Workshop

Inside the largest machine shop north of Brisbane

9,000 m² under one roof, 13 m of floor-borer travel, 150 t under the hook and gear cutting to 5.5 m — a tour in numbers.

9,000 m² · 150 t · Ø 5.5 m
Large Cat tracked dozer from the hire fleet parked in front of the ABC Heavy Engineering building in Paget
Heavy machinery

Cat D11 dozers join the hire fleet

Mine-spec D11, D10 and D10T2 Tier 4 Final dozers, available for hire and sale alongside cranes from 20 t to 275 t.

Dozers · cranes 20–275 t
Young ABC tradesperson marking out a large machined flange against the QA drawing on the Paget workshop floor
Careers

Why our crews stay: 4.5 stars on SEEK

An employer rating of 4.5/5 with 91% recommending ABC — “Management were apart of the team, very hands on.”

4.5 / 5 SEEK · 91% recommend

[Directors] Confirm client & project nameability (Q9) · cards unlinked until each story is approved and photographed.

In preparation

Stories waiting on photography.

Documented and drafted — published once the directors supply originals and sign off the details.

Community

Mackay Special Children’s Christmas Party — and a year of giving back

ABC’s support for the Christmas party and cancer-research fundraising, from the crew’s socials to the community.

Workshop

Slew bearing rebuilds at 30% of replacement cost — how it works

How an OEM slew bearing is condition-assessed, fully rebuilt and warranted for as little as 30% of its replacement cost.

[Directors] Approve the blog seed list · supply photography and details per story before publication.

Request a quote

The next story could be your machine.

Send the drawing or the broken part. The team that repairs all in house, 24/7, will scope it across all seven departments and come back with a quote and a QA plan.

Request a quote Call 07 4952 3444
01 02 03